Contract Identification
Role of Applicant and %
26 - 05 - 2012



29 - 12 - 2011



28 - 12 - 2011



28 - 10 - 2011



22 - 09 - 2011



10 - 08 - 2011



18 - 06 - 2011



12 - 05 - 2011



12 - 05 - 2011



23 - 03 - 2011



24 - 12 - 2010



25 - 08 - 2010



28 - 10 - 2009



16 - 10 - 2008



28 - 12 - 2007

























































20 - 04 - 1994
16 - 05 - 1994

The water-suply of Ballsh "Construction of water supply in the area Spitali " Center with xingato pipes DN 89 mm , 76 mm "General excavation and realisation of the special parts

Contractor with 100 % of works
05 - 06 - 1995
25 - 06 - 1995

Water supply Mujalli Realisation for 20 days in 1995 " Construction of the main line of Mujalli village with steel pipes DN 114 mm and 89 mm " General excavation and hidroinsulation

Contractor with 100 % of works
03 - 04 - 1998
August, 1998

Road Patos Realisation 4 months in 1998 "Asphalting layer, sidewalks ect. Realisation of city roads starting from Albpetrol ex- building (today city municipaly) up to the center city at the cultural palace

Contractor with 100 % of works
20 - 05 - 1998
20 - 10 - 2004

First fase: up to 2002 • The construction of the ump stations in Cipllake and Petove • The construction of the electric cabs in Cipllake and Petove • The construction of two deposits, the chlorine room in Petove • The construction of the main deposit and the chlor room in Vajkan • The construction of the electric line, High Voltage in Cipllake and Petove • The construction of the three sending water lines with steel pipes ( Cipllak – Vajkan , Petov –Vajkan,Mujalli –Vajkan ), diameter from 76 mm up to 114 mm, length about 10 km. • The construction of the distributive network with steel and PE pipes in Petove. • The fixing of the sinking electropump in Cipllake. • The fixing of the sinking electropump in Petove. • The fixing of the centrifugal electropump to the station of Mujalli. The second fase : december 2002 – october 2004 • The construction of the main distributive network, for Verri and Kallm, with steel pipes 133 mm, with PE pipes 140 mm, length about 7 km • The construction of the distributive network in Verri, with PE pipes, length about 2,5 km. • The construction of the distributive network in Kallm, with PE pipes, length about 5 km. In total there are realized about 30 km of pipelines. The ending of this contract make possible the supply with potable water for these villages: Kallm i madh, Kallm i vogel , Verri , Vajkan , Petove and Cipllake. This is an water-supply very fused because of to the Kallm area there isn’t any source of potable water , and they get the water from the three opened wells in Petove – Cipllake and Mujalli (the commune of Libofshe) and their sending with pressure up to the deposit of Vajkan. (a hill to the right of the road Lushnje – Fier.)

Contractor with 100 % of works
05 - 03 - 1999
24 - 12 - 2001

Rehabilitation of road axis Librazhd-Elbasan, Corridor -8 LibrazhdRealisation from 1999-2000 without interruptions " Collaboration in production of inerts,ballast,and stone fractions.For this project Jon shpk made use of high machinery "Realisation of road layers and special parts of the contract "Transportation of inerts to the place of work

Contractor with 100 % of works
15 - 04 - 1999
30 - 06 - 1999

Lapulec Lofkend Road Lapulec - Lofkend Realisation for 4 months in 1999 "Systemisation,holes filling ,channels ,ballast layer , art work etc "Realisation with a length of 10km in mountainous terrain "The road starts from the main road Fier Ballsh- Lapulec - Lofkend

Contractor with 100 % of works
05 - 05 - 1999
10 - 06 - 1999

Seman camping Seman Section Executed for 35 days on 1999 • Internal roads with rubble, the leveling of the courts, of the vehicle and machinery emplacements •The construction of the drain sewer •Different kinds of sieges

Contractor with 100 % of works
15 - 06 - 1999
20 - 07 - 1999

Executed for 5 weeks on 1999 • The construction of the distribution line of potable water to “1 Maji” quarte of Patos, starting from the drugstore – ex section of the communal, zone nr.2 – the elementary school, with steel pipes DN 273 mm. • The construction of the getting manhole from the drugstore in the main present, and of the distribution manhole to the end of the pipeline, the digging and hydro-insulation works .

Contractor with 100 % of works
05 - 07 - 1999
13 - 07 - 1999

Patos Camping Patos Realisation for 8 days in 1999 "Systemisation ,inside roads ,fencing ect. "Construction of water reservoir ( metal water turret 12 m height where is placed the reservoir)

Contractor with 100 % of works
05 - 07 - 1999
08 - 07 - 1999

Rroskovec Road Rroskovec Realisation in 3 days in 1999 "Asphalting Rroskovec road ,penetration + 4 cm concrete layer for a 4000 m2 surface

Contractor with 100 % of works
06 - 05 - 2000
15 - 09 - 2005

Road reconstruction from Vaikanit turn to the section Kallem - VerriRealisation June 2005 - September 2005 "Systematization of the hole road ax, general excavations. "Realisation of Art work "Rolling ballast layer and other inerts "Mechanically stabilized base layer "Binder layer "Bituminous layer 20cm This road connects Vaikan village with Kallm for a length 8 km and width 5 m..This road links the sections of oil utilisation For good realisation of the bituminous sand layer is worked in 30 grade C temperature

Contractor with 100 % of works
05 - 07 - 2000
10 - 08 - 2000

Sewerage system,Adriatik Lushnje Realisation 5 weeks in 2000 "Removal of the excisting pipes "Construction of the main collector PVC ,OD 200 mm, "Construction of the suppoting collectors in all the 5 floor buildings "Rehabilitation of the hole including the new coverage "Construction of a pump station "Supply and placing submerging pump for the sewage water "Supply and placing pipes for sewage water PE , OD 90 mm 1000m length,electrofusion welding

Contractor with 100 % of works
15 - 07 - 2000
24 - 10 - 2000

Executed for 12 weeks on 2000 • The construction of sending water line (the pumping), the pumping station Gogolas – depo Vanaj, with PE pipes , PN 16 , OD 140 mm, head to head welding . • The construction of main, for the distribution of the water from the store of Vanaj – the direction of the road Fier Lushnje, with PE pipes, PN 10, OD 180 mm, head to head welding. • The construction of main, for the distribution of the water from the store Gogolas – to the direction of Bitaj village, with PE pipes, PN 10, OD 63 mm, electrofusion welding. • The construction of the all distribution lines for the area, with PE pipes , PN 10 , OD 125 mm , 110 mm, head to head welding and OD 90 mm, 75 mm, 63 mm electrofusion welding. • The construction of many overpassing and subways to the irrigation sewer, and the communication’s bridges too. • The construction and the mounting of about 60 control’s and commandation’s prefabricated manholes, and the placement of all the special parts, like valves, bends, flange adaptors, water meters, dischargers, ventilation etc, all of them are austrian production “HAWLE” • The placement Vendosja ne te gjitha kendet e ndryshimit te vendosjes se tubacioneve dhe ne gjatesi te tyre i shenuesve ( tregues te vendendodhjes se tubacioneve) • The placement of the all indicator-bands for the pipelines ((distinctive signs on the pipeline to the sewer). • The testof the all lines before their cover, under the pressure. • Digging works, the protective layer with sand and the covering all over the work. The total length of the pipes placed is about 22 km.

Contractor with 100 % of works
25 - 08 - 2000
30 - 12 - 2000

Water supply Varibop Executed for 75 days on 2000 • The construction of the sending line, the main Patos – Depo Yzeiraj, with steel pipe DN 133mm, with about 5 km of length. • The construction of the sending line , main Patos – Depo Kociaj, with steel pipes DN 108 mm, with about 3 km length. The execution of digging works, hydro-insulation and special parts, during getting and sending.

Contractor with 100 % of works
05 - 04 - 2001
31 - 12 - 2002

Water supply PATOS Realisation : First phase April 2001 - August 2001 "General excavation,opening and coverage of the channel,art works "Supply and placing steel pipes DN 219 mm from500 m3 Memez deposit ( Cakran ) to Lalar (Gjanices bridge ) "Hidroinsulation of steel pipes Placing of the special parts Realisation second phase July 2002 - December 2002 "General excavation,opening and coverage of the channel,art works "Placing steel pipes DN 219 mm From Lalari (Gjanices bridge) to 2000 m3 Patos deposit "Hidroinsulation of steel pipes Placing of the special parts In total are placed 7,63 km steel pipes DN 219 mm. Realisation of this contract double the water transportation of Memez deposit, for this reason a new paralel line was constructed

Contractor with 100 % of works
05 - 06 - 2001
26 - 06 - 2001

Tre Ura Road Grabian LushnjeRealisation 21 days June 2001 "Profiling the road axsis Tre Urat - Grabian with ballast and gravel also rolling "Mechanically stabilized base layer in the entire road

Contractor with 100 % of works
08 - 07 - 2001
20 - 12 - 2001

Water supply Fushe Magjat Kucove Realisation :July 2001 - December 2001 "Construction of the pipeline with steel pipes 89 mm "Construction of pump station "Supply and placing of the electropump "Deposit construction 100 m3 "DN 1114 mm, 89 mm, 76 mm etj "Construction of the pipeline with steel pipes

Contractor with 100 % of works
10 - 07 - 2001
25 - 07 - 2001

Hambar Cakran Road Realisation for 15 days , July 2001 "Holes filling in the entire axis Baxho - Hambar "Drainage system "Sub-base layer,rolling of the ballast and gravel along the road axis

Contractor with 100 % of works
11 - 10 - 2001
28 - 12 - 2001

Hambar Cakran RoadRealisation for 15 days , July 2001 "Holes filling in the entire axis Baxho - Hambar "Drainage system "Sub-base layer,rolling of the ballast and gravel along the road axisRoad Asphalting Unaza PatosRealisation October 2001-December 2001 "Start at the entrance of Patos city (ring) and finishes at the stadium. "Holes filling "Concreting of side channels "Art works "Ballast layer and rolling "Mechanically stabilized base layer "Binder layer "Asphalting layer 4 cm

Contractor with 100 % of works
15 - 10 - 2001
10 - 01 - 2002

Asphalting road Patos Ring Realisation October 2001 - January 2002 "Starts from the stadium to the city municipaly. "Pits filling "Concreting of side channels "Art works "Ballast layer and rolling "Mechanically stabilized base layer "Binder layer "Asphalting layer 4 cm

Contractor with 100 % of works
10 - 07 - 2002
25 - 12 - 2002

Mix water canalisation CakranRealisation:July 2002 - December2002 "Realisation of the main collectors for all the village center with B/ A d 600 mm,400mm,300mm,200 mm ect..the main axis pass through Mihaj the hospital Buzmadh joins with Zekos channel, the hosital-main road -PTT-Zekos channel,three floor buildings main road- zekos channel. Construction of wells controll

Contractor with 100 % of works
10 - 07 - 2002
25 - 12 - 2002

Reconstruction of the Cultural Palace Patos Realisation: July 2002 - December 2002 "Removal operations,the windows, the scene,the wall layers. "Works in all the surroundings the replacment of doors and windows "Special works in the halls of the palace "Electrical works ,new equipments "Hidroinsulating roof "Painting

Contractor with 100 % of works
07 - 08 - 2002
23 - 09 - 2002

Water supply Hoxhare Realisation August2002 -September2002 "Pipelines inside Hoxhare village with pipes PE , PN 10 , OD 90 mm, 75 mm, 63 mm,40 mm,electrofusion welding

Contractor with 100 % of works
14 - 10 - 2002
20 - 08 - 2003

Water supply Bocove The fist fase executed from october 2002 – up to december 2002 • The construction of the main with PE pipes, PN 10, OD 90 mm and 75 mm, electrofusion welding. • The supply and the placement of a voltage stabilizer to the central station o fthe water, fot the entire area ( Bocov – Hoxhare) • The construction of two water deposit, one in Bocove 100 m3 and the other in Rreth fik 50 m3 • The construction of two pump stations, one in Bocove and the oher in Rreth fik. • The suply and the placement of eights centrifugal electropumps, each of them with Q = 5 l /sek. The second fase executed from june 2003 – up to august 2003 • The construction of the supply power lines, for the two stations. • The construction of the distributive water network, for two villages Bocove and Rrethfik PE pipes, PN 10, OD 75 mm, 50 mm, 40 mm , 32 mm and 25 mm, electrofusion welding. • The construction of 9 manholes, the supply and the placement of the special parts. The total amount of the PE pipes placed is about 6 km.

Contractor with 100 % of works
14 - 12 - 2002
31 - 12 - 2003

The construction of the water supply Verbas – Sheqishte Realisation :July 2002 - Dhjetor 2002 "Construction of the main magistrial Verbas deposit with steel pipes 159 mm "Construction of the main magistrial Verbas - Frasher with pipes PE , OD 140 mm , PN 10 , head by head welding "Construction of inside magistrial Verbas village with pipes PE ,PN 10 , OD 90 mm, 75 mm, 63 mm,electrofusion welding "Well construction and placing of special parts Realisation : Second phase June 2003 - December 2003 "Pipelines in Sheqishte and Frasher with pipes PE , PN 10 , OD 90 mm, 75 mm, 63 mm, 40 mm, electrofusion welding "Well opening 250 ML deep "Supply and placing elctropump Q = 12 lit / sek , Realisation: Third phase July2004 - Septamber 2004 " Pipelines in Sheqishte dhe Frasher pipes PE , PN 10 , OD 90 mm, 75 mm, 63 mm, 40 mm, electrofusion welding " Supply and placing the special parts With the works ending the entire zone covered by this water supply is supplied with drinking water 24 hours a day. All the materials used in this contract are exported from "EUROTUBI" Milano, Italy also the pumps are exported from the north Italy all according to the standarts

Contractor with 100 % of works
12 - 05 - 2003
24 - 12 - 2004

The construction of the primary network of the water-supply and sewerage (first lot) in Mbrostar – Ferko Bashkia Fier, Executed from may 2003 – up to december 2004 • The construction of the main collector, of the discharge of the black waters with beton B/A pipes with beaker, diameter 800 mm, length about 420 ml • The supply and the placement of PE pipes for sewerage, head to head welding, diameter 630 mm, length about 1248 ml • The supply and the placement of PE pipes for sewerage, head to head welding, diameter 400 mm, 315 mm , 200 mm, 140 mm, length about 2004 ml • The constructionof 107 manholes, diameter nga 600 – 800 mm , h= 1.5 m for sewerage. • The supply and placement of PE pipes, PN 10 for potable water, diameter 160 mm, head to head welding, length 1200 ml • The supply and the placement of special parts. • The construction of the road with stabilizant, binder and asphalto-beton layers, in a surface of about 5300 m2 In total there are placed PE pipes, welded head to head, about 4452 ml of steel pipes, starting from DN 140 mm up to 630 mm, and 420ml of beton arme pipes. For the first time, from the investments in Albania by the albanian companies, we reached to weld pipes of DN 630mm pipes on site. It’s worth to accentuate that the all pipes used here are from “GEBERIT”, and this contract is realized with the presence of the specialists of Geberit. Also for the first time in Albania, in this contract is realized the supply and the placement of beton pipes with beaker, ensuring in this way a hermetic and fixed joint, a beton bases for the all basis where the pipes are going to lean, and realizing with a special cement the joints to the beaker’s necks, first with support plinths and then with collars in each pipe. This ject starts to Mbrostar Ferko, the city of Fier ( the exit of Fier, going to Celingrad, just passing the railway, including the all area there, which have had a lot of problem for the sewerage), and ends jointing the main collector of Fier city, which pass parallel with Gjanica river (the direction brdge of forest company – Mbrostar bridge. After the conclusion of the works, there hppened some inundations during the winter of 2004 and in few minues the area didn’t had any problem for the drawing of the white and black waters together..

Contractor with 100 % of works
20 - 06 - 2003
15 - 05 - 2004

Building reconstruction of Albpetrol Sh.A. Realisation June 2003 - May 2004 "Removal of the old plastering,the floor , the roof layer, the stairs and the fencing "Reconstruction of the building ,placing windows, doors,hidroinsulation with guaiana and brastone "Water Well opening and placing submerging pump "Supply and placing of drinking water system,telephone lines,computer system,inside and outside lighting " Realisation of decorative ceilings,floor of high quality, conference rooms,and the main offices Braitstone floor at the roof additional level with metalic construction. Supply and placing new telecommanding doors and decorative tiles in plazas and outside the fencing. "Painting "Realisation of the cooling system and warming system by placing oil-fired boileri " Aspiration and ventilation system in all the halls of the building. Total volume of the building 5300 m3 "All the materials used are from Italy according to the standarts

Contractor with 100 % of works
09 - 07 - 2003
15 - 06 - 2004

Road Patos - Patos I Lartem Realisation July 2003 - June 2004 "This road starts at the entrance of Fier city (municipaly building) and finishes in Margellic with a length 7,5 km. "Removal of the older layer with bituminous sand "Holes filling "Ballast layer and rolling "Mechanically stabilized base layer "Binder layer "Asphalting layer "Art works.

Contractor with 100 % of works
30 - 10 - 2003
17 - 06 - 2004

Regional water supply Pojan - KorceRealisation October 2003 - August 2004 " Construction water deposit B/A 500 m3 "For this work we have taken water from an underground source around 7-8 m deep.We installed concrete pipes with holes by creating a microreservoir to make use of the water with pumps "Construction of the pump station and placing centifugal electropumps with Q = 20 l / sek, H = 100 m , H th = 5 m , 2 pieces "The outside line ( pumps station ??? deposit 500m2) with pipes PE , d 160 mm, PN 10 , head by head welding ,length 650 m " Pipelines PE, PN 10, head by head welding ,d 200 mm L = 5200ml and electrofusion welding with pipes PE, PN 10 , D 90mm L = 1656 ml "In Rembec branching ,pipelines with pipes PE , PN 10 , D125 mm L = 2150 ml "Supply of electricity ,line construction 10 KV,placing autotransformators ect.

Contractor with 100 % of works
07 - 04 - 2004
26 - 05 - 2004

Partial Replacement of pipelines. Magistrial in the first section in Marrinez Realisation April 2004 - May2004 "General excavation "Supply and placing high pressure pipes- 80 bar, for oil transportation , with DN 273 mm,hidroinsulant "Pipeline testing according to the contract conditions with the pressure prove. "Supply and placing the special parts Total of 608 ml steel pipes for oil transportation

Contractor with 100 % of works
July, 2004
July, 2004

A terrace hydroinsulation Executed on july 2004 • The termoinsulation with polisterol • The realization of a layer of 5 cm, with concrete, with special cement (SC1 – BASE against the pull). • The realization of the all necks, all over the perimeter and the other details on the terrace. • The hydro insulation with betonguajna • The elaboration of the concrete surface, to the insole of the stairs cage (the cleaning, the leveling with a diamond cutter). • The hydro insulation of the insole of the stairs cage with blue nortig.

06 - 08 - 2004
15 - 08 - 2004

Industrial Floor Realisation August2004 - August2004 "Realisation of the pavement with concrete and proccesed for heavy vehicles up to 50 ton "Realisation of the plastic layer and side bands "The concrete was requested according to the Europian standarts with the assistance of the engineer sent from NORD RESINE "Fixing steel framework 20x20 cm with steel D 8mm "All the realisation is done with laser equipments "Processed concret layer with quartz and steel fibre "This work was proccesed with helicopter "Protection layer against dust and oil Realisation 2200 m2 industrial floor with 100% materials used of NORDRESINE also with their assistance . We underline that the realisation of the concrete is done according to proper classes (refering to the europian standart).we interfer in the factory for the formula by using our aditiv of NORDRESINE,from the laboratoric proofs after 7 days and 28 days result that the planed concrete mark Rck300 reached rck325-415.

Contractor with 100 % of works
05 - 10 - 2004
28 - 12 - 2004

Water supply Cakran Realisation October 2004 - December2004 "Construction of the main magistrial with pipes PE D180 mm, PN 16 and PN 10 with length 7 km "Supply and placing of a plunger electropump Q=18 lit /sek , H = 180 M "Depot construction B/A in Cakran

Contractor with 100 % of works
07 - 10 - 2004
14 - 12 - 2004

Asphalting two road separated in segments Maji- Heronjte e Linasit road -Horizontal road which pass through Nafteyari 1Maji quarters Realisation October2004 - December2004 "Sistematization of both roads,General excavations "Realisation of Art work "Rolling ballast layer and other inerts "Mechanically stabilized base layer "Binder layer "Asphalting layer "The lighting System and the sidewalks Heronjte e Linasit road connects the main boulevard with the city ring starting from the town square and finishs in the nordwest of the stadium The horizontal road passes through 1 Maji quarter it connects with the ring of the city 100m in the nordwest of road connection heronjte e Linasit with the ring

Contractor with 100 % of works
13 - 10 - 2004
21 - 10 - 2004

Industrial Floor - Q.T.U. "Qendra tregetare universi" TiraneRealisation October 2004 - October2004 "Realisation of the pavement with concrete and proccesed for heavy vehicles up to 50 ton "Realisation of the plastic layer and side bands "The concrete was requested according to the Europian standarts with the assistance of the engineer sent from NORD RESINE "Fixing steel framework 20x20 cm with steel D 8mm "All the realisation is done with laser equipments "Processed concret layer with quartz and steel fibre with colors "This work was proccesed with helicopter "Protection layer against dust and oil

Contractor with 100 % of works
November, 2004
March, 2005

The pipeline substitution for the 644-th group Sheqishte Executed from 2004 – to march 2005 • Earth works, like diggings, canal coverings, undergrounds, etc. • The supply and the placement of the steel pressure pipes - 80 bar, for the oil transmission, DN 323.9 mm and DN 159 mm, • The pipeline test before its delivery, in accordance with the technical conditions about the pressure test. • The supply and the placement of the special parts. Totally there are realized 1111ml of steel pipes for the oil transmission

21 - 11 - 2004
20 - 03 - 2005

Pipeline replacment for 644 group Sheqishte Realisation November 2004 - March2005 "General excavations "Supply and placing steel pipes of high pressure 80 bar,for oil transmitionDN 323.9 mm and DN 159 mm, "Testing the pipelines with the pressure prove. "Supply and placing of special parts Total 1111 ml steel pipes for oil transmition

Contractor with 100 % of works
03 - 12 - 2004
29 - 12 - 2004

Road reconstruction Patos - Patos i Lartem The lighting System Patos Masrgellic Realisation December 2004 - December 2004 "Civil Works ,general excavation "Supply and placing the lighting colums "Supply and placing of lighters "Works testing Realisation of road lighting Patos i lartem - Margellic after asphalting this road by placing 23 columns. All the materials used are brought from Italy.

Contractor with 100 % of works
2005
2006

Hydroinsulations, bathrooms, balcons, industrial floorings, car houses Executed: 2005 - 2006 “ROGERD” shpk Hydroinsolation with bi-component material (guajna concrete)

2005
2005

The reconstruction of the Seismological Institute building, Tirana Executed on 2005

January, 2005
March, 2005

The substitution of the pipeline in the 644th group SHEQISHTE Executed from january 2005 – march 2005 • Earth works, like digging and covering canals, undergrounds, etc.. • The supply and the placement of high density steel pipes - 80 bar, for the transmission of the oil, DN 219 mm, hydro insulated in the factory.. • The supply and the placement of the high density steel pipes - 80 bar, for the transmission of the oil , DN 159 mm, hydro insulated in the factory. • The test of the pipeline, before its delivery, in accordance with the technical conditions of the pressure test. Totally there are realized 1900 ml steel pipe for the oil transmission.

17 - 01 - 2005
20 - 07 - 2005

LOT 12 Project no12-AL 01 02 .C.01.12 for Rehabilitation of Road Infrastucture in Fier Districts Realisation January 2005 - July 2005 First Object 1 - Rehabilitation of the road in 1 maji quarter in Patos municipaly with a length 5.4 km : "Systematization of the hole road ax, general excavations. "Realisation of Art work "Rolling ballast layer and other inerts "Stabilisant layer "Binder layer "Lighting system and sidewalks Second object ???Rehabilitation of Velmisht road, Strum commune with a length 1.53 km : "Systematization of the hole road ax, general excavations. "Realisation of Art work "Rolling ballast layer and other inerts "Stabilisant layer "Binder layer "Lighting system and sidewalks Third object - rehabilitation of the road Luar Kuman commune with a length 2.52 km : "Systematization of the hole road ax, general excavations. "Realisation of Art work "Rolling ballast layer and other inerts "Stabilisant layer "Binder layer "Bituminous layer "Lighting system and sidewalks

Contractor with 100 % of works
20 - 05 - 2005
2006

Horizontal Road Reconstruction Naftetari quarter-1maji quarter Realisation . May 2005 in process Realisation for 2005 ,value 9 999 678 leke "Systematization of the hole road ax, general excavations. "Realisation of Art work "Rolling ballast layer and other inerts "Stabilisant layer "Binder layer "Bituminous layer "Lighting system and sidewalks This road links naftetari quarter with 1 Maji and it is paralel with the city ring and the main boulevard.

Contractor with 100% of works
August, 2005
September, 2005

Industrial flooring “ Pallat mbrapa drejtorise qendrore te postave’ (the building after the Central Directory of post) Tirane Executed from august 2005 – september 2005 • The realization of an industrial flooring with concrete B/A, and elaborated for car houses. • The placement of the plastic layer and the lateral bands. • There was intervened to the concrete production factory (Albabeton ) in Tirana, for the formulation of the concrete production in accordance with the European standards, with the assistance of the Italian engineer, sent by NORD RESINE • There was realized the assembly of the iron armature with carriers of 20x20 cm, with diameter of the iron 5 mm • It was placed on the object by leveling with a laser equipment • Was elaborated the concrete surface with additive and armoured (with steel fibers and colored) quartz • The elaborating with helicopter • The cutting (the opening of the whirligigs withmotor-saw) and their joining. • There was elaborated the surface to protect it from the oils and from the dusts.. There was realized the internal and external rampa, the external one was coloured

August, 2005
September, 2005

Industrial flooring “ Pallati shumekate tek Zogu I Zi Tirane Executed from august 2005 – to september 2005 • The realization of an industrial flooring of concrete B/A and elaborated for car houses. • The placement of the plastic layer and the lateral bands. • There was intervened to the concrete production factory (Albabeton ) in Tirana, for the formulation of the concrete production in accordance with the European standards, with the assistance of the Italian engineer, sent by NORD RESINE • There was realized the assembly of the iron armature with carriers of 20x20 cm, with diameter of the iron 5 mm • It was placed on the object by leveling with a laser equipment • Was elaborated the concrete surface with additive and armoured (with steel fibers and colored) quartz • The elaborating with helicopter • The cutting (the opening of the whirligigs with motor-saw) and their joining. • There was elaborated the surface to protect it from the oils and from the dusts There was realized the internal and external rampa.

09 - 08 - 2005
24 - 09 - 2005

Water supply in Cakran village August 2005 - September 2005 "General excavation and filling "Supply and placing pipes PE 100,PN 10, OD 180 mm "Supply and placing special parts Realisation of this contract is the continuation of water supply from the pump station Selishte to the drinking water deposit Cakran ( Mihaj ). This magistrial delivers 18 l /sek of water

Contractor with 100 % of works
September, 2005
September, 2007

Industrial flooring “ Multifloor buildings at “Rruga Komuna E Parisit” Tirane Executed from september 2005 – up to 2007 First phase september – october 2005 Second phase March 2006- May 2006 Third phase: july 2007 Forth phase: august 2007 – september 2007 In every phase there are realized similar works : Industrial flooring for the car houses and the ramps for passing from one floor to another. Positively: • The realization of an industrial flooring of concrete B/A and elaborated for car houses. • The placement of the plastic layer and the lateral bands. • There was intervened to the concrete production factory (Albabeton ) in Tirana, for the formulation of the concrete production in accordance with the European standards, with the assistance of the Italian engineer, sent by NORD RESINE • There was realized the assembly of the iron armature with carriers of 20x20 cm, with diameter of the iron 5 mm • It was placed on the object by leveling with a laser equipment • Was elaborated the concrete surface with additive and armoured (with steel fibers and colored) quartz • The elaborating with helicopter • The cutting (the opening of the whirligigs withmotor-saw) and their joining. • There was elaborated the surface to protect it from the oils and from the dusts There was realized the internal and external ramps Up to know there are realized about 12 000 m2 of industrial flooring and about 900 m2 of ramps..

15 - 09 - 2005
September, 2008

Rehabilitation of water reservoir Nr4 in Shkodra ( 8000 m3) Realisation 15 September2005 - In procces "Removal of existing cover on roof 8000 m3 "By mechanical means and high pressure cleaning (horizontal and vertical) "Removal of exposed reinforcement of columns on roof "Hydroinsulation layer "Hydraulic links "Command room The concrete is according to ONORMA (austriak standart) refering ???white concrete" impenetrable by water at a grade 100% and without hidro insulation Object value 619425 euro(+TVSH)

Contractor with 100 % of works
2006
2007

Hydroinsulations, bathrooms, and terraces with special materials. Object: Building (palace) Executed: 2006 - 2007 “PALUSHI” shpk Hydroinsulations in terrace with bi-component material, guajna cemention (guajna concrete) and EPILASTIC

2006
2006

The riconstruction of the water supply of Selenice Executed on 2006

2006
2006

The riconctruction of the road Petro Sota, Fier Eecuted on 2006

2006
2006

The construction of the sewerage of Lagjia e Re, sud side, Patos Executed on 2006

2006
2006

The discharge of the road of Commune of Frasher Executed on 2006

2006
2006

The clearing of the sewerage to the Durres city Executed on 2006

2006
2006

Executed: 2006 Hydroinsulations, underground floorings, with special materials Object: Building (palace) “SALILLARI” shpk External walls' hydroinsulations, in underground floor with bituminos,fluid, cold material.

07 - 06 - 2006
12 - 07 - 2006

Loti 4 Depot nr 4 Arapaj, and beach area Currila Durres Realisation 07 June 2006 - July First object-Depot line nr 4 - Arapaj "Pipeline PE 100,OD 140 and 110 mm L= 1000 ml "Delivery line PE 100, OD 90,OD 75 ,OD 63 "General excavation "Command wells 3 pieces "Delivery wells 4 pieces "Technological links Second object - Water supply in Currila beach area "Pipeline with pipes PE 100, 110 mm L= 1500 ml "General excavation "Supply and placing water measurments 50 pieces "Delivery lines PE 100, OD 90,OD 75 ,OD 63 ect. "Road rehabilitation

Contractor with 100 % of works
2007
2007

The construction of the sewerage Lagjia Kenete Durres Executed on 2007

2007
2007

The construction of the sewerage Lagjia e Re, Patos Executed on 2007

2007
2007

Hydroinsulations, 3 underground floorings with special materials. Object: Building (palace) Executed: 2007 “GENER 2” shpk

2007
2007

Industrial floor in accordance with UNI EN 11146 standard. Object : Olive Store Vlora, Fier, Elbasan Executed: 2007 Farmacrete floor with rezina for olive factory. “AGROTAL” Sh.a

2007
2007

Industrial floor, car houses, in accordance with UNI EN 11146, standard. Object : Building (palace) Executed: 2007 “SAG” Shpk Industrial flloor with thicness 10 cm, concrete rck 25-30, processed with quartz. The ramps fish back realized with wet quartz paste on wet on concrete.

2007
2007

Hydroinsulations 2 underground floors with special materials. Object: Building (palace) Executed: 2007 “SAG” Shpk Internal hydroisulations with nordcem and in externial concrete walls, 2 underground floors with guajna concrete.

2007
2007

Industrial flooring, landing ramps to the underground floors and hydroinsulations of the deposit water in accordance with UNI EN 11146 standard, Object : Building (palace) Executed: 2007 “GENER 2” shpk • The realization of an industrial flooring with concrete B/A, and elaborated for car houses • The placement of the plastic layer and the lateral bands • There was realized the assembly of the iron armature with carriers of 20x20 cm, with diameter of the iron 5 mm • It was placed on the object by leveling with a laser equipment • Was elaborated the concrete surface with additive and armoured (with steel fibers and colored) quartz • The elaborating with helicopter • The cutting (the opening of the whirligigs with motor-saw) and their joining • There was elaborated the surface to protect it from the oils and from the dusts. There was realized the internal and external rampa, Up to know there are realized about 12000 m2 of industrial flooring and about 900 m2 of ramps.

2009
2009

Hydro-insulation of the two underground floors, where is included: the hydro-insulation of the walls with Volgrip (bentonite), the placement of the waterstop WT102, placement of the Break for the creation of the vertical spacing (fuge) on the concrete; the hydro-insulation of the spacing (fuge) between sections with ADEKA KM (waterstop with bentonite base); the hydro-insulation of the potable water reservoir with Plastivo Hydro (certified waterproofing for the potable water). “Matrix Construction”

2009
2009

The hydro-insulation of an old cellar, with the amortization of the walls and ceiling (mainly iron), two underground floors where is included: the rehabilitation of the iron armature with Sanofer (a material that prevents and protects it from the rust)); the creation of the protective layer with Fibromix 40 (mix cement fibro-armed) ; the hydro- insulation with Plastivo 250 (a waterproofing re-vesture and with high elasticity that works under a negative pressure ); the closure of the present water leaks with TAP 3 (a tixo – tropic hydro- insulation mixing with fast freezing and rigor); the hydro-insulation with the material against the humidity - Calibro PE with three components; the placement of the liquid waterstop - P201 (water stop at the joint points of the concrete ) etc. "Private building" Durres

2009

The realisation of the antibachterial flooring for the operating rooms and the other ambient of the hospital. The realisation of the fllooring operating rooms with Colorex Pasific EC is in collaboration with Forbo, S= 200 m2. The installing of the Marmoleum Fresco in the other ambient of the hospital, S= 800 m2. The technology that is used is of the best standart, and positively in collaboration with Forbo.

2009

Floor directon parterre elaboured with quartz ICE Contact: Hamit Basha Nr. 0692055213

March, 2009
September, 2009

The realisation of the antibachterial flooring for the operating rooms and the other ambient of the hospital. The custemer: Terna SA the baranch of Albania The investitor: Hygeia Group The “Hygeia” Hospital Tirana, a member of the HYGEIA GROUP based in Athens, Greece, is hiring qualified healthcare professionals to staff its new 220-bed general & maternity hospital in Tirana. Hygeia Hospital Tirana offers a competitive salary package, training and the opportunity to work in the most modern hospital in Albania, in association with the HYGEIA Group, the Region’s leading private health care provider. The realisation of the fllooring operating rooms with Colorex Basil EC is in collaboration with Forbo, S= 4000 m2. The installing of the Marmoleum Real in the other ambient of the hospital, S= 12.000 m2. The technology that is used is of the best standart, and positively in collaboration with Forbo.

Contractor 100%
July, 2009
July, 2009

Industrial floor with a surface of 9500m2, realized in accordance with normative UNI EN 11146, with a thickness of 22 cm, with steel fibers. The term of realization, in 7 days. On this floor for the first time it is realized the cast of the concrete with laser machine (Vibrofinitrice laser SXP) making possible to realize in each day about 1400 m2. “JON” shpk has realized this in collaboration with B NORD PAVI 2000 and it is realized in accordance with European normative. Also is realized the leveling of the stabilizer sub-layer with thickness of about 5 cm with Archimede machine that do the leveling of the all surface with a maximal mistake of about 1 cm (on the surface of 9500 m2). There are done, in advance, all the tests to achieve the resistance under compression of the sub-layer (the verification before the cast of the concrete) "Prespa Invest"

October, 2009
October, 2009

Hydro-insulation of the two underground floors, where is included: the hydro-insulation of the walls with Volgrip (bentonite), the placement of the waterstop WT102, the placement of Break for the creation of the vertical spacing (fuge) on the concrete. "2R Construction"

October, 2009
2009

Hydro-insulation of the two underground floors, where is included: the hydro-insulation of the walls with Volgrip (bentonite), the placement of the waterstop WT102, the placement of Break for the creation of the vertical spacing (fuge) on the concrete. "A&EM"

21 - 09 - 2010
30 - 12 - 2011



10 - 06 - 2012
10 - 07 - 2012

test

ishte12